Hazards + exposures
The trench rule is 1.5 metres, and it triggers two separate duties
Most people on site know there is a number, and know it is 1.5 metres. Fewer know it does two different jobs. At that depth a trench becomes high risk construction work, which requires a Safe Work Method Statement. Separately and in its own regulation, the same depth triggers a duty to secure the area and to support every side of the trench. Meeting one is not meeting the other.
What excavation work actually covers
Broader than digging a hole. The Code’s definition is
work to make an excavation or to fill or partly fill an excavation
, and it notes the work
commonly includes work involving the removal of soil or rock from a site to form an open
face, hole or cavity, including trenches, shafts and tunnels
. Backfilling is excavation
work. So is partial backfilling.
The exclusions are worth knowing because they are narrow and specific. The requirements
do not apply to a mine, a bore to which a relevant water law applies, or a trench used as a
place of interment
. That last one is not a curiosity: it means a grave is carved out of this
Code by name, and everything else that looks like a trench is not.
Excavation work is also construction work
This is the structural point people miss, and the Code states it plainly:
Work connected with an excavation is a type of ‘construction work’.
The
consequence follows immediately, that
when carrying out excavation work, the requirements relating to construction work must also
be complied with
.
So the excavation duties sit on top of the construction duties rather than replacing them. Anyone treating an excavation as a self-contained job with its own rulebook is reading half the obligations.
The first 1.5 metres: a SWMS
Construction work carried out in or near
a shaft or trench with an excavated depth of greater than 1.5 metres
, or a tunnel, is
high risk construction work, for which a Safe Work Method Statement (SWMS) must be
prepared
.
Note greater than, and note in or near. The trigger is not
only working down in the trench; work beside one deep enough counts. And a site commonly has
several kinds of high risk construction work at once. The Code allows for that: where different
types occur together, one SWMS may be prepared to cover any high risk construction work
activities being carried out at the workplace
, or a separate SWMS for each. One document
covering the lot is permitted, provided it actually covers the lot.
The second 1.5 metres: secure it, and support every side
A separate regulation, WHS Regulation 306, attaches at the same depth and does different
work. A PCBU proposing to excavate a trench at least 1.5 metres deep must ensure, so far as is
reasonably practicable, that the work area is
secured from unauthorised entry including inadvertent entry
.
Then the part that decides whether people live: the PCBU must
minimise the risk to any person arising from the collapse of the trench by ensuring that all
sides of the trench are adequately supported
, by one or more of:
shoring by shielding or other comparable means
benching
, orbattering
All sides. Not the side you are working against. The Code adds that
combining methods may be most effective, and that
In built-up areas or streets the excavation may have to be fully or partly sheeted or
supported to prevent collapse due to localised vehicle movement
, which is the traffic
passing a few metres away doing what traffic does to saturated ground.
Why the slope that held yesterday proves nothing
Benching and battering are the methods that work without positive ground support, and the
Code is careful about what they depend on. It describes a safe excavated slope as one where
the slope does not flatten when left for a considerable period, there is no movement of
material down the slope, and the toe of the slope remains in the same place
.
And then the conditional that carries the risk. If work is planned without shoring,
the continuing safety of the excavation will depend on the conditions arising during
construction
. Where conditions are not as expected or change, for example different soils or
heavy rain and flooding,
action should be taken immediately to protect workers, other persons and property
,
including suspending work until the ground is stable or providing positive ground support.
That is the whole argument against experience as a control. A batter angle that held through a dry week is a statement about last week’s ground. Rain overnight, a different soil horizon two metres along, a truck parked where there was none, and the assumption underneath the batter has quietly changed.
Where this meets confined spaces
Our explainer on what counts as a confined space notes that a trench is not a confined space on the risk of structural collapse alone, only if it may contain harmful airborne contaminants. This is the other half of that: collapse is governed here, in the excavation duties, with its own threshold and its own controls. A deep trench with bad air is both, and needs both sets of controls, not whichever one the crew is trained in.
How we made this
Every quoted passage is verbatim from the Model Code of Practice: Excavation work, which we downloaded and read in full, and each was checked character by character against the document. The regulation numbering and the depth thresholds are quoted rather than paraphrased because each of them decides whether a duty applies.
One extraction trap worth recording. In the PDF, the decimal point in the Regulation 306 threshold is encoded as a private-use glyph rather than a full stop, so a naive text extraction renders "1.5 metres" as "15 metres". We caught it because a fifteen metre trench threshold is absurd on its face, and confirmed the correct figure against the same rule stated elsewhere in the document. Anyone quoting depths out of this PDF should check that specific line.
This is general information about a model code, not legal advice, and model codes are approved jurisdiction by jurisdiction, so confirm your regulator has approved this code and whether it has been varied locally. The observation about experience as a control is our editorial judgement built on the Code’s stated conditions, not a finding of the Code. We hold no commercial interest in shoring equipment, training or certification.
Sources
- Safe Work Australia, Model Code of Practice: Excavation work (70 pages, downloaded and read in full 23 August 2026): the definition of excavation work and the mine, water-bore and place-of-interment exclusions; that excavation work is a type of construction work and construction requirements also apply; the greater-than-1.5-metre shaft or trench and tunnel trigger for high risk construction work and the SWMS requirement; that one SWMS may cover several kinds of high risk construction work at a workplace; WHS Regulation 306 and the duty to secure a trench at least 1.5 metres deep from unauthorised entry; the duty to support all sides by shoring, benching or battering; the sheeting note for built-up areas and streets; and the description of a stable slope and of acting immediately when conditions change.
See an error? Request a correction and we will check it against the sources above and log the outcome.